Sunday, May 30, 2010

level 2

Once the kitchen was pulled out, all that was left was a dirty great big cavity with chunks of cement missing, pipes and wires protruding from every surface. We had to level the foundation by pouring levelling concrete so that the tiles would lay flat and even.






No comments:

Post a Comment